Data center in Toamasina
Data center in Toamasina is an operational data center in Toamasina, Madagascar. Our footprint estimate of its power is about 0.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.5 MW (range 0.3 MW to 0.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 432 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 210 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -18.15388, 49.41359 |
Power and grid
| Power plants within 50 km | 9 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
|---|---|
| Grid carbon intensity | 394 g CO₂ per kWh (Madagascar, 2024) Average of all power made in the area. Ember. |
| Grid power mix | hydro 33.2%, oil and other fossil 33.2%, coal 18.5%, solar 14%, bioenergy 1.1%. Clean power: 48.3% |
Climate and water
| Average temperature | 23.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.1 °C (2001 to 2025) |
| Cooling degree days | 2,088 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Low (<10%) (Madagascar) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Toamasina use?
We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Toamasina?
The grid in Madagascar emits about 394 g CO₂ per kWh (2024). Largest sources: hydro 33.2%, oil and other fossil 33.2%, coal 18.5%.
Sources
Correct this page or get the data