Data Center Directory

Data center in Turku

Data center in Turku is an operational data center in Turku, Finland. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
Facility power1.5 MW (range 0.8 MW to 2.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,273 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressKupittaankatu 152, 20810, Turku
Coordinates60.43655, 22.25740

Power and grid

Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Turku use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Turku?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Data centers near Turku

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.