Data center in Ulanqab is an operational data center in Ulanqab, China. Our footprint estimate of its power is about 10 MW.

Key facts

StatusOperational
Facility power10 MW (range 4.2 MW to 26 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 86,517 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.98327, 113.31706

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 2.6 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 220 kV, 4.5 km away
HV substations within 10 km8
Power plants within 50 km3.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Average temperature4.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.9 °C (2001 to 2025)
Cooling degree days172 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.52 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (China)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Ulanqab use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

How close is Data center in Ulanqab to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 2.6 km away.

How clean is the power for Data center in Ulanqab?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.