Data center in Värnamo

Data center in Värnamo is an operational data center in Värnamo, Sweden. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
Facility power0.5 MW (range 0.3 MW to 0.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 435 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates57.33792, 14.10001

Power and grid

Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Sweden)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Värnamo use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Värnamo?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.