Data center in Wichita Falls is an operational data center in Wichita Falls, United States. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.9 MW (range 2 MW to 6.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,280 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Airport Drive 2236, 76306, Wichita Falls |
| Coordinates | 33.95337, -98.52479 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 2.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Fisher Road Substation, 345 kV, 11.5 km away |
| HV substations within 10 km | 10 |
| Utility | Southwest Rural Elec Assn INC Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 80 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 17.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 1,508 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.94 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Wichita Falls use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
How close is Data center in Wichita Falls to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 2.5 km away. The local utility is Southwest Rural Elec Assn INC, in the SWPP balancing area.
How clean is the power for Data center in Wichita Falls?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.