Data center in Zhenzhou

Data center in Zhenzhou is an operational data center in Zhenzhou, China. Our footprint estimate of its power is about 7.1 MW.

Key facts

StatusOperational
Facility power7.1 MW (range 3.6 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,920 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates32.26140, 119.24225

Power and grid

Nearest high-voltage substationUnnamed substation, 220 kV, 4.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
Power plants within 50 km23 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.4 °C (2001 to 2025)
Cooling degree days1,116 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.66 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayMedium - High (20-40%) (Jiangsu)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Zhenzhou use?

We estimate the facility power at about 7.1 MW. Estimate from building footprint, low confidence.

How close is Data center in Zhenzhou to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 4.8 km away.

How clean is the power for Data center in Zhenzhou?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.