中国移动通信集团湖南有限公司 data center in Zhuzhou
中国移动通信集团湖南有限公司 data center in Zhuzhou is an operational data center operated by 中国移动通信集团湖南有限公司 in Zhuzhou, China. Our footprint estimate of its power is about 7.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 中国移动通信集团湖南有限公司 |
| Facility power | 7.9 MW (range 3.9 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,564 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 27.96943, 113.17055 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 500 kV, 3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 2.4 GW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 528 g CO₂ per kWh (China, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1% |
Climate and water
| Average temperature | 17.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 1,335 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.35 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Hunan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 中国移动通信集团湖南有限公司 data center in Zhuzhou use?
We estimate the facility power at about 7.9 MW. Estimate from building footprint, low confidence.
How close is 中国移动通信集团湖南有限公司 data center in Zhuzhou to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (500 kV), about 3 km away.
How clean is the power for 中国移动通信集团湖南有限公司 data center in Zhuzhou?
The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.
Who operates 中国移动通信集团湖南有限公司 data center in Zhuzhou?
中国移动通信集团湖南有限公司.
Data centers near Zhuzhou
- 中国移动通信集团湖南有限公司 data center in Zhuzhou 355 m · 8.3 MW
- 顺兴通讯 29.7 km
- 联想售后服务中心(银盆路店) 35.3 km
- 中南大学后勤生活服务中心 36.6 km
- 长沙市交通事故快处快赔服务中心 37.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.