Data Center Internacional Ingeniero Jose Luis Massera
Data Center Internacional Ingeniero Jose Luis Massera is an operational data center operated by ANTEL in Pando, Uruguay. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ANTEL |
| Facility power | 17 MW (range 8.5 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,211 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | Datacenter Ingeniero José Luis Massera |
| Address | Bypass de Pando |
| Coordinates | -34.72506, -55.94722 |
| Website | antel.com.uy/web/datacenter |
Power and grid
| Nearest high-voltage substation | Subestación Norte 150kV, 150 kV, 24.8 km away (UTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 500 kV, 30.8 km away |
| Power plants within 50 km | 282 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 80 g CO₂ per kWh (Uruguay, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 40.6%, hydro 27.3%, bioenergy 24.8%, solar 5.2%, oil and other fossil 2.2%. Clean power: 97.8% |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 670 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.78 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Canelones) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center Internacional Ingeniero Jose Luis Massera use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Data Center Internacional Ingeniero Jose Luis Massera to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Norte 150kV (150 kV), about 24.8 km away.
How clean is the power for Data Center Internacional Ingeniero Jose Luis Massera?
The grid in Uruguay emits about 80 g CO₂ per kWh (2025). Largest sources: wind 40.6%, hydro 27.3%, bioenergy 24.8%.
Who operates Data Center Internacional Ingeniero Jose Luis Massera?
ANTEL.
Data centers near Pando
- DataCenter de Google Uruguay 10.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.