Data Center Directory

Data Center Internacional Ingeniero Jose Luis Massera

Data Center Internacional Ingeniero Jose Luis Massera is an operational data center operated by ANTEL in Pando, Uruguay. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorANTEL
Facility power17 MW (range 8.5 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,211 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asDatacenter Ingeniero José Luis Massera
AddressBypass de Pando
Coordinates-34.72506, -55.94722
Websiteantel.com.uy/web/datacenter

Power and grid

Nearest high-voltage substationSubestación Norte 150kV, 150 kV, 24.8 km away (UTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 500 kV, 30.8 km away
Power plants within 50 km282 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity80 g CO₂ per kWh (Uruguay, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 40.6%, hydro 27.3%, bioenergy 24.8%, solar 5.2%, oil and other fossil 2.2%. Clean power: 97.8%

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days670 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.78 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (Canelones)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data Center Internacional Ingeniero Jose Luis Massera use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Data Center Internacional Ingeniero Jose Luis Massera to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Norte 150kV (150 kV), about 24.8 km away.

How clean is the power for Data Center Internacional Ingeniero Jose Luis Massera?

The grid in Uruguay emits about 80 g CO₂ per kWh (2025). Largest sources: wind 40.6%, hydro 27.3%, bioenergy 24.8%.

Who operates Data Center Internacional Ingeniero Jose Luis Massera?

ANTEL.

Data centers near Pando

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.