Data Center Uralsk

Data Center Uralsk is an operational data center in Oral, Kazakhstan. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates51.28383, 51.47622

Power and grid

Nearest high-voltage substationUnnamed substation, 220 kV, 13.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km100 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity812 g CO₂ per kWh (Kazakhstan, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 58.2%, gas 27%, hydro 8.4%, wind 4.1%, solar 1.8%. Clean power: 14.3%

Climate and water

Average temperature6.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.3 °C (2001 to 2025)
Cooling degree days449 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.56 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayMedium - High (20-40%) (West Kazakhstan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Data Center Uralsk to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 13.8 km away.

How clean is the power for Data Center Uralsk?

The grid in Kazakhstan emits about 812 g CO₂ per kWh (2025). Largest sources: coal 58.2%, gas 27%, hydro 8.4%.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.