Data Hub Nepal is an operational data center operated by Data Hub Nepal in Kathmandu, Nepal. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Data Hub Nepal |
| Address | 2nd Floor, Shikhar Biz Center Thapathali |
| Coordinates | 27.69145, 85.31964 |
| Website | datahub.com.np |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 4.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 7.9 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 14 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 24 g CO₂ per kWh (Nepal, 2024) Average of all power made in the area. Ember. |
| Grid power mix | hydro 97.1%, solar 2.9%. Clean power: 100% |
Climate and water
| Average temperature | 19.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.9 °C (2001 to 2025) |
| Cooling degree days | 1,044 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 2.4 m/s average |
| Water stress today | High (40-80%) (Nepal) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Data Hub Nepal to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 4.3 km away.
How clean is the power for Data Hub Nepal?
The grid in Nepal emits about 24 g CO₂ per kWh (2024). Largest sources: hydro 97.1%, solar 2.9%.
Who operates Data Hub Nepal?
Data Hub Nepal.
Data centers near Kathmandu
- Cloud Himalaya 120 m
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.