Datenverarbeitungszentrum Mecklenburg-Vorpommern
Datenverarbeitungszentrum Mecklenburg-Vorpommern is an operational data center in Lankow, Germany. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.3 MW (range 2.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,305 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.64697, 11.38111 |
Power and grid
| Nearest high-voltage substation | Lankow, 110 kV, 800 m away (WEMAG) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Görries, 380 kV, 5.2 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 356 MW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.4 °C (2001 to 2025) |
| Cooling degree days | 86 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Mecklenburg-Vorpommern) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datenverarbeitungszentrum Mecklenburg-Vorpommern use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
How close is Datenverarbeitungszentrum Mecklenburg-Vorpommern to the power grid?
The nearest high-voltage substation in OpenStreetMap is Lankow (110 kV), about 800 m away.
How clean is the power for Datenverarbeitungszentrum Mecklenburg-Vorpommern?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Lankow
- Planet IC 5.9 km · 1.4 MW
- PLANET IC V (Schwerin) 6.0 km
- ITSMZ 27.2 km · 3.6 MW
- CSN Solutions - Kehrsen 39.7 km
- CSN Solutions Gudow 40.9 km
- LYNET Lübeck 52.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.