DC Brno - FASTER CZ is an operational data center operated by O2 Czech Republic a.s. in Maloměřice, Czechia. Our footprint estimate of its power is about 3.7 MW.

Key facts

StatusOperational
OperatorO2 Czech Republic a.s.
Facility power3.7 MW (range 1.8 MW to 5.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,528 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Opened2013-10-02
Coordinates49.21629, 16.65954

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 1.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSokolnice, 400 kV, 11.9 km away
HV substations within 10 km23
Power plants within 50 km2.5 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity401 g CO₂ per kWh (Czechia, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 42.3%, coal 35.2%, bioenergy 8%, solar 5.8%, gas 5.4%. Clean power: 59.2%
Industrial power priceEUR 0.154 per kWh (Czechia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.2 °C (2001 to 2025)
Cooling degree days217 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.11 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayLow - Medium (10-20%) (Czechia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DC Brno - FASTER CZ use?

We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.

How close is DC Brno - FASTER CZ to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.1 km away.

How clean is the power for DC Brno - FASTER CZ?

The grid in Czechia emits about 401 g CO₂ per kWh (2025). Largest sources: nuclear 42.3%, coal 35.2%, bioenergy 8%.

Who operates DC Brno - FASTER CZ?

O2 Czech Republic a.s..

Data centers near Maloměřice

More O2 Czech Republic a.s. data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.