DC Brno - FASTER CZ
DC Brno - FASTER CZ is an operational data center operated by O2 Czech Republic a.s. in Maloměřice, Czechia. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | O2 Czech Republic a.s. |
| Facility power | 3.7 MW (range 1.8 MW to 5.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,528 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2013-10-02 |
| Coordinates | 49.21629, 16.65954 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sokolnice, 400 kV, 11.9 km away |
| HV substations within 10 km | 23 |
| Power plants within 50 km | 2.5 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 401 g CO₂ per kWh (Czechia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 42.3%, coal 35.2%, bioenergy 8%, solar 5.8%, gas 5.4%. Clean power: 59.2% |
| Industrial power price | EUR 0.154 per kWh (Czechia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.2 °C (2001 to 2025) |
| Cooling degree days | 217 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Czechia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC Brno - FASTER CZ use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
How close is DC Brno - FASTER CZ to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.1 km away.
How clean is the power for DC Brno - FASTER CZ?
The grid in Czechia emits about 401 g CO₂ per kWh (2025). Largest sources: nuclear 42.3%, coal 35.2%, bioenergy 8%.
Who operates DC Brno - FASTER CZ?
O2 Czech Republic a.s..
Data centers near Maloměřice
- itself TH Brno 1.2 km
- Master DC Brno 3.7 km
- DC Antoninska 4.4 km
- DC Kounicova 4.9 km
- itself TH Ivančice 26.1 km
- Dat, s.r.o 60.6 km
- Datacentrum Moravia 61.0 km
- DC Monaco 61.9 km
More O2 Czech Republic a.s. data centers
- DC Chodov Czechia
- DC Stodůlky Czechia
- DC Monaco Czechia
Sources
Correct this page or get the data