Data Center Directory

DC North

DC North is an operational data center operated by CRATIS in Varaždin, Croatia. Our footprint estimate of its power is about 3.1 MW.

Key facts

StatusOperational
OperatorCRATIS
Facility power3.1 MW (range 1.5 MW to 4.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,571 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 1 internet exchanges
PeeringDB.
AddressIvane Brlić-Mažuranić 30
Coordinates46.28192, 16.36040
Websitedcnorth.hr

Power and grid

Grid carbon intensity159 g CO₂ per kWh (Croatia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 39.3%, wind 21.2%, gas 18.6%, solar 8.9%, bioenergy 6.8%. Clean power: 76.3%
Industrial power priceEUR 0.124 per kWh (Croatia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Croatia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DC North use?

We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.

How clean is the power for DC North?

The grid in Croatia emits about 159 g CO₂ per kWh (2025). Largest sources: hydro 39.3%, wind 21.2%, gas 18.6%.

Who operates DC North?

CRATIS.

Data centers near Varaždin

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.