Dhoho Data Center
Dhoho Data Center is an operational data center operated by PT Dhoho Mitra Abadi in Kota Kediri, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PT Dhoho Mitra Abadi |
| Networks | 1 networks PeeringDB. |
| Address | Jalan Sersan Bahrun 76, Mojoroto |
| Coordinates | -7.77962, 111.99861 |
| Website | dhoho.net |
Power and grid
| Nearest high-voltage substation | Gardu Induk Surya, 150 kV, 3.9 km away (Perusahaan Listrik Negara) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GITET Kediri, 500 kV, 7.9 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 111 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 25.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 2,807 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.26 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Dhoho Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Surya (150 kV), about 3.9 km away.
How clean is the power for Dhoho Data Center?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates Dhoho Data Center?
PT Dhoho Mitra Abadi.
Data centers near Kota Kediri
- Gayatri-DC-1 29.5 km
- Big Network Indonesia 38.1 km
- DBN Data Center Blitar 41.3 km
- DC-MJK Computing ID 59.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.