DirecTV data center in Tucson
DirecTV data center in Tucson is an operational data center operated by DirecTV in Tucson, United States. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DirecTV |
| Facility power | 2.4 MW (range 1.2 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,970 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | East Old Vail Road 9608, 85747, Tucson |
| Coordinates | 32.09271, -110.78742 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 345 kV, 3.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Tucson Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TEPC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 1.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.4 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 1,650 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.79 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DirecTV data center in Tucson use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
How close is DirecTV data center in Tucson to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 3.5 km away. The local utility is Tucson Electric Power Co, in the TEPC balancing area.
How clean is the power for DirecTV data center in Tucson?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates DirecTV data center in Tucson?
DirecTV.
Data centers near Tucson
- ark data centers - Tucson, AZ 18.0 km
- Simply Bits DC1 20.3 km
- Login Tucson 24.1 km
- DirecTV data center in Benson 47.4 km · 0.6 MW
More DirecTV data centers
- DirecTV data center in Benson United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.