Data Center Directory

DITO CO64

DITO CO64 is an operational data center in Butuan, Philippines. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates8.93649, 125.53943

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 3.4 km away (National Grid Corporation of the Philippines)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km133 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity569 g CO₂ per kWh (Philippines, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27%

Climate and water

Average temperature25 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.4 °C (2001 to 2025)
Cooling degree days2,702 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.83 kWh per m² per day
Wind at 50 m3.2 m/s average
Water stress todayMedium - High (20-40%) (Philippines)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is DITO CO64 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 3.4 km away.

How clean is the power for DITO CO64?

The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.