DREAMMARK1 Datacenter
DREAMMARK1 Datacenter is an operational data center operated by DREAMLINE in Guro-gu, South Korea. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DREAMLINE |
| Facility power | 21 MW (range 11 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,932 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | DREAMMARK1 IDC · kt cloud Namguro · 드림마크원 데이터센터 |
| Address | DREAMMARK1, 61, Digital-ro 31-gil |
| Opened | 2004 |
| Coordinates | 37.48587, 126.89153 |
| Website | dreammark1.co.kr |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 154 kV, 1.5 km away (한국전력공사) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 3.8 km away |
| HV substations within 10 km | 39 |
| Power plants within 50 km | 26 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 418 g CO₂ per kWh (South Korea, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 31.1%, nuclear 29.4%, gas 28%, solar 6%, bioenergy 3.2%. Clean power: 39.9% |
Climate and water
| Average temperature | 11.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.4 °C (2001 to 2025) |
| Cooling degree days | 551 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.81 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Gyeonggi-do) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DREAMMARK1 Datacenter use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is DREAMMARK1 Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (154 kV), about 1.5 km away.
How clean is the power for DREAMMARK1 Datacenter?
The grid in South Korea emits about 418 g CO₂ per kWh (2025). Largest sources: coal 31.1%, nuclear 29.4%, gas 28%.
Who operates DREAMMARK1 Datacenter?
DREAMLINE.
Data centers near Guro-gu
- NetRealty SEL1 - Gasan 807 m
- KINX Gasan 1.1 km
- KT Guro 1.1 km
- SK브로드밴드 IDC 1.2 km · 41 MW
- DCI Seoul 01 (SEL01) 1.2 km
- STTGDC SEL1 1.6 km
- kt cloud Yeouido 4.7 km
- kt cloud Mokdong(MD1) 5.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.