Data Center Directory

East Kentucky Network Datacenter

East Kentucky Network Datacenter is an operational data center in Ivel, United States. Our footprint estimate of its power is about 2.9 MW.

Key facts

StatusOperational
Facility power2.9 MW (range 1.5 MW to 4.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,444 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressTechnology Trail 271, 41642, Ivel
Coordinates37.60019, -82.67877
Websiteekn.com

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 5.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
UtilityKentucky Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineKentucky-West Virginia Gas Co, intrastate pipeline, 1.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km111 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days677 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.06 kWh per m² per day
Wind at 50 m4.1 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does East Kentucky Network Datacenter use?

We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.

How close is East Kentucky Network Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 5.9 km away. The local utility is Kentucky Power Co, in the PJM balancing area.

How clean is the power for East Kentucky Network Datacenter?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Data centers near Ivel

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.