EdgeUno Datacenter Quito Ecuador (UIO1) is an operational data center operated by EdgeUno in Quito, Ecuador. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeUno |
| Networks | 4 networks PeeringDB. |
| Address | Ave. Naciones Unidas E6-99 Edificio Banco Bolivariano |
| Coordinates | -0.17578, -78.48279 |
| Website | edgeuno.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 3.6 km away (E.E. Quito) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 14.5 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 205 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 158 g CO₂ per kWh (Ecuador, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 77.6%, oil and other fossil 17.9%, gas 2.6%, bioenergy 0.8%, solar 0.5%. Clean power: 79.5% |
Climate and water
| Average temperature | 17.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28.3 °C (2001 to 2025) |
| Cooling degree days | 134 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.83 kWh per m² per day |
| Wind at 50 m | 2.4 m/s average |
| Water stress today | Low (<10%) (Pichincha) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeUno Datacenter Quito Ecuador (UIO1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 3.6 km away.
How clean is the power for EdgeUno Datacenter Quito Ecuador (UIO1)?
The grid in Ecuador emits about 158 g CO₂ per kWh (2025). Largest sources: hydro 77.6%, oil and other fossil 17.9%, gas 2.6%.
Who operates EdgeUno Datacenter Quito Ecuador (UIO1)?
EdgeUno.
Data centers near Quito
- CNT EP - PICHINCHA - UIOINQ 794 m
- DEVESOFFT S.A. 6.6 km
- Telconet Cloudcenter Quito 7.0 km
- DEL PRADO .com.ec 7.9 km
- CNT EP - PICHINCHA - UIOETT 10.8 km
- Opticom Quito DC01 18.0 km