Edificio Telepuerto is an operational data center operated by Empresa Nacional de Telecomunicaciones in Santiváñez, Bolivia. Our footprint estimate of its power is about 3 MW.

Key facts

StatusOperational
OperatorEmpresa Nacional de Telecomunicaciones
Facility power3 MW (range 1.5 MW to 4.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,256 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asData Center ENTEL
AddressAvenida I, Santiváñez
Opened2019
Coordinates-17.55571, -66.25135
Websiteentel.bo/EmpCorporativoDataCenter

Power and grid

Grid carbon intensity481 g CO₂ per kWh (Bolivia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 62.4%, hydro 27.9%, bioenergy 3.2%, solar 3%, wind 2%. Clean power: 36.1%

Climate and water

Water stress todayLow (<10%) (Cochabamba)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Edificio Telepuerto use?

We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.

How clean is the power for Edificio Telepuerto?

The grid in Bolivia emits about 481 g CO₂ per kWh (2025). Largest sources: gas 62.4%, hydro 27.9%, bioenergy 3.2%.

Who operates Edificio Telepuerto?

Empresa Nacional de Telecomunicaciones.

Data centers near Santiváñez

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.