Envision Galaxy Ulanqab
Envision Galaxy Ulanqab is an operational data center that is still expanding, in Ulanqab, China. Its power is about 153 MW, growing to about 612 MW by 2027-12. Epoch AI estimates about 48,000 H100-equivalent AI chips (Ascend 950PR).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Facility power | 153 MW Reported (Epoch AI or owner data) |
| IT power | 118 MW |
| Planned power | 612 MW by 2027-12-01 Epoch AI timeline projection. |
| AI compute | 48,000 H100-equivalents → 170,000 planned |
| AI chips | Ascend 950PR Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 66,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 4.5 billion → 17.8 billion planned Epoch AI estimate, 2025 USD. |
| Coordinates | 40.99027, 113.13156 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2025-08-01 | 0 | 0 | Land clearing begins for Building 1. |
| 2026-05-11 | 0 | 0 | Building 2 is under construction. |
| 2026-08-06 | 0 | 0 | Building 1 being [commissioned](https://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html), Building 3 under construction |
| 2026-09-05 | 0 | 0 | Land clearing begins for Building 4. |
| 2026-11-01 | 153 MW | 48,000 | Building 1 expected to be fully operational, assuming a 3-month fit-out period |
| 2027-07-01 (projected) | 306 MW | 89,000 | Building 2 expected to be fully operational, assuming a 3-month fitout period after taking one year from land clearing to commissioning, as demonstrated by Building 1. Similarly. Building 3 is expected to be commissioned now. |
| 2027-12-01 (projected) | 612 MW | 170,000 | Building 4 expected to be fully operational, assuming a 3-month fitout period after taking one year from land clearing to commissioning as demonstrated by Building 1. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-11-01 | Ascend 950PR | 94,856 | Estimate |
| 2027-07-01 | Ascend 950DT | 33,010 | Estimate |
| 2027-07-01 | Ascend 950PR | 142,283 | Estimate |
| 2027-12-01 | Ascend 950DT | 99,029 | Estimate |
| 2027-12-01 | Ascend 950PR | 237,139 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Envision Galaxy Ulanqab use?
Public data puts the facility power at about 153 MW, with about 612 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Envision Galaxy Ulanqab use?
Reported chips: Ascend 950PR.
Data centers near Ulanqab
- Data center in Jining 6.8 km · 36 MW
- Data center in Jining 7.4 km · 15 MW
- 乌兰察布华为云数据中心 8.5 km · 4.3 MW
- Data center in Ulanqab 8.7 km · 9.7 MW
- Data center in Ulanqab 9.1 km · 24 MW
- Data center in Ulanqab 9.2 km · 22 MW
- 阿里巴巴乌兰察布数据中心 9.4 km · 20 MW
- Data center in Ulanqab 9.6 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.