Data Center Directory

Euclyde DC5

Euclyde DC5 is an operational data center operated by Euclyde in Villeurbanne, France. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorEuclyde
Facility power1.4 MW (range 0.7 MW to 2.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,182 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates45.77248, 4.87154

Power and grid

Nearest high-voltage substationPoste électrique de Bonneterre, 225 kV, 1.3 km away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km11
Power plants within 50 km6.9 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.6 °C (2001 to 2025)
Cooling degree days311 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.58 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Euclyde DC5 use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is Euclyde DC5 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Bonneterre (225 kV), about 1.3 km away.

How clean is the power for Euclyde DC5?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Euclyde DC5?

Euclyde.

Data centers near Villeurbanne

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.