Data Center Directory

Fermi Matador

Fermi Matador is a data center under construction in Amarillo, United States. No power figure is public for this site yet.

Key facts

StatusUnder construction
Coordinates35.29292, -101.57083

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 1.4 km away (Xcel Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 15.7 km away
HV substations within 10 km4
UtilitySouthwestern Public Service Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineONEOK Westex Pipeline, intrastate pipeline, 2.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.8 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature15.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.9 °C (2001 to 2025)
Cooling degree days1,113 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.22 kWh per m² per day
Wind at 50 m7.5 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Fermi Matador to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.4 km away. The local utility is Southwestern Public Service Co, in the SWPP balancing area.

How clean is the power for Fermi Matador?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Data centers near Amarillo

Sources

Correct this page or get the data