广东农信数据中心
广东农信数据中心 is an operational data center in Foshan, China. Our footprint estimate of its power is about 30 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 30 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,368 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 23.07333, 113.15309 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 广东农信数据中心 use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
Data centers near Foshan
- 中国电信佛山(开普勒)华南数据中心 11.6 km · 123 MW
- 中国电信智慧城市数据中心 12.7 km · 9.7 MW
- 广州长途电信线路局 14.3 km
- 广州南站RBC中心 15.7 km · 22 MW
- Microsoft 18.1 km
- 华南师范大学广州校区石牌校园网络中心 20.9 km
- China International Electronic Commerce Center 23.2 km
- 百度地图顺德数据中心 37.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.