GAD-Rechenzentrum 2
GAD-Rechenzentrum 2 is an operational data center operated by Atruvia in Münster, Germany. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Atruvia |
| Facility power | 14 MW (range 7.2 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,992 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Stockholmer Straße 11, 48163, Münster |
| Opened | 2016 |
| Coordinates | 51.89347, 7.59630 |
Power and grid
| Nearest high-voltage substation | Amelsbüren, 220 kV, 900 m away (Amprion) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 6.2 GW in 33 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.4 °C (2001 to 2025) |
| Cooling degree days | 105 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GAD-Rechenzentrum 2 use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is GAD-Rechenzentrum 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Amelsbüren (220 kV), about 900 m away.
How clean is the power for GAD-Rechenzentrum 2?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates GAD-Rechenzentrum 2?
Atruvia.
Data centers near Münster
- 1&1 Versatel Telehaus Münster 5.9 km
- Servergebäude 8.1 km · 0.8 MW
- Rechenzentrum Citeq 9.1 km
- GLOBE Development Datacenter Münster 12.1 km
- Fiducia & GAD IT data center in Münster 13.0 km · 17 MW
- TKRZ Greven (GRV1) 27.3 km
- DMO - Datacenter Münster Osnabrück (DMO1) 27.4 km · 0.7 MW
- TKRZ Emsdetten (EMS1) 29.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.