Gauß-IT-Zentrum
Gauß-IT-Zentrum is an operational data center operated by TU Braunschweig in Braunschweig, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TU Braunschweig |
| Coordinates | 52.27650, 10.54173 |
Power and grid
| Nearest high-voltage substation | Braunschweig Stadtmitte, 110 kV, 1.4 km away (Braunschweiger Netz GmbH) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Braunschweig Nord, 220 kV, 3.7 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 729 MW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.4 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Gauß-IT-Zentrum to the power grid?
The nearest high-voltage substation in OpenStreetMap is Braunschweig Stadtmitte (110 kV), about 1.4 km away.
How clean is the power for Gauß-IT-Zentrum?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Gauß-IT-Zentrum?
TU Braunschweig.
Data centers near Braunschweig
- Wolfsburg Nordkopf Tower (WNT) 24.0 km
- PDV Systeme data center in Goslar 39.3 km · 0.8 MW