GBS Datacenter is an operational data center operated by Global Broadband Solution in Gombe, Congo - Kinshasa. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorGlobal Broadband Solution
Networks2 networks
PeeringDB.
Address4630 avenue de la Science
Coordinates-4.32376, 15.28929
Websitegbs.cd

Power and grid

Nearest high-voltage substationPoste 220kV Utexco, 220 kV, 1.1 km away (SNEL)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km30 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity24 g CO₂ per kWh (Congo - Kinshasa, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 98.7%, solar 1.2%. Clean power: 100%

Climate and water

Average temperature24.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.7 °C (2001 to 2025)
Cooling degree days2,427 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.5 kWh per m² per day
Wind at 50 m2.9 m/s average
Water stress todayLow (<10%) (Kinshasa)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is GBS Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste 220kV Utexco (220 kV), about 1.1 km away.

How clean is the power for GBS Datacenter?

The grid in Congo - Kinshasa emits about 24 g CO₂ per kWh (2024). Largest sources: hydro 98.7%, solar 1.2%.

Who operates GBS Datacenter?

Global Broadband Solution.

Data centers near Gombe

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.