Google台灣資料中心 is an operational data center in 彰化縣, Taiwan. Our footprint estimate of its power is about 26 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 26 MW (range 11 MW to 66 MW) Estimate from building footprint, low confidence. Footprint estimate: about 220,031 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 彰濱西二路 85, 507, 彰化縣 |
| Coordinates | 24.13920, 120.42536 |
| Website | google.com/about/datacenters/locations/changhua-county |
Power and grid
| Grid carbon intensity | 634 g CO₂ per kWh (Taiwan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.8%, coal 36.1%, solar 5.5%, wind 4.2%, hydro 1.9%. Clean power: 13.5% |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google台灣資料中心 use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
What chips does Google台灣資料中心 use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google台灣資料中心?
The grid in Taiwan emits about 634 g CO₂ per kWh (2025). Largest sources: gas 48.8%, coal 36.1%, solar 5.5%.
Data centers near 彰化縣
- NCHC Taichung 19.9 km
- 中華電信IDC台中黎明機房 21.3 km
- NCHC Hsinchu 91.9 km
- Taiwania 2 92.4 km · 1.5 MW