GSIC TSUBAME 3.0
GSIC TSUBAME 3.0 is an operational AI data center operated by Tokyo Institute of Technology in Okayama, Japan. Its power is about 2.7 MW. Epoch AI estimates about 23 H100-equivalent AI chips (NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2).
Key facts
| Status | Operational |
|---|---|
| Operator | Tokyo Institute of Technology |
| Facility power | 2.7 MW Reported (Epoch AI or owner data) |
| AI compute | 23 H100-equivalents |
| AI chips | NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2 Reported (Epoch AI or owner data) |
| Chip count | 4,224 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ookayama, Japan |
| Coordinates | 34.66251, 133.92426 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 岡山変電所, 220 kV, 11.1 km away |
| HV substations within 10 km | 13 |
| Power plants within 50 km | 6.5 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 869 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Okayama) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| GSIC TSUBAME 2.5 | NVIDIA Tesla K20X | 4,224 | 2.7 MW | 2014-06-01 |
| GSIC TSUBAME 3.0 | NVIDIA Tesla P100 SXM2 | 2,156 | 1.5 MW | 2017-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GSIC TSUBAME 3.0 use?
Public data puts the facility power at about 2.7 MW. Reported (Epoch AI or owner data).
What chips does GSIC TSUBAME 3.0 use?
Reported chips: NVIDIA Tesla K20X, NVIDIA Tesla P100 SXM2.
How close is GSIC TSUBAME 3.0 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.7 km away.
How clean is the power for GSIC TSUBAME 3.0?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates GSIC TSUBAME 3.0?
Tokyo Institute of Technology.
Data centers near Okayama
- NTT 246 m · 17 MW
- ドコモ 1.7 km
- NTT 3.1 km
- TOKAIコミュニケーションズ data center in Okayama 8.2 km
- 日立 data center in Okayama 8.4 km
- KDDI 37.3 km
- NTTドコモ 37.7 km
- STNet data center in Takamatsu 39.5 km
More Tokyo Institute of Technology data centers
- TSUBAME4.0 Japan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.