Data Center Directory

HiMORE Digital

HiMORE Digital is an operational data center operated by HiMORE Digital in Taipei, Taiwan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorHiMORE Digital
Address台北市內湖區瑞光路408號2樓之2
Coordinates25.07812, 121.57041
Websitehimore.net

Power and grid

Nearest high-voltage substation民生變電所, 161 kV, 2.5 km away (台灣電力公司)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation汐止超高壓變電所, 345 kV, 7.2 km away
HV substations within 10 km42
Power plants within 50 km10 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity634 g CO₂ per kWh (Taiwan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.8%, coal 36.1%, solar 5.5%, wind 4.2%, hydro 1.9%. Clean power: 13.5%

Climate and water

Average temperature21.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.9 °C (2001 to 2025)
Cooling degree days1,612 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.71 kWh per m² per day
Wind at 50 m6.2 m/s average

Satellite view

Questions

How close is HiMORE Digital to the power grid?

The nearest high-voltage substation in OpenStreetMap is 民生變電所 (161 kV), about 2.5 km away.

How clean is the power for HiMORE Digital?

The grid in Taiwan emits about 634 g CO₂ per kWh (2025). Largest sources: gas 48.8%, coal 36.1%, solar 5.5%.

Who operates HiMORE Digital?

HiMORE Digital.

Data centers near Taipei

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.