醫院管理局支援服務中心 Hospital Authority Supporting Services Centre
醫院管理局支援服務中心 Hospital Authority Supporting Services Centre is an operational data center in Tung Chung, Hong Kong SAR China. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3 MW (range 1.2 MW to 7.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,885 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 翠群徑 Chui Kwan Drive 8 |
| Coordinates | 22.28336, 113.94089 |
Power and grid
| Nearest high-voltage substation | 中電港珠澳大橋變電站 CLP HongKong-Zhuhai-Macao Bridge Substation, 132 kV, 3.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 數碼港275千伏電站 Cyberport 275kV Substation, 275 kV, 20 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 19 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 673 g CO₂ per kWh (Hong Kong SAR China, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 63.8%, coal 33.5%, oil and other fossil 1.2%, solar 1%. Clean power: 1.5% |
Climate and water
| Average temperature | 23.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 2,136 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.14 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 醫院管理局支援服務中心 Hospital Authority Supporting Services Centre use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is 醫院管理局支援服務中心 Hospital Authority Supporting Services Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is 中電港珠澳大橋變電站 CLP HongKong-Zhuhai-Macao Bridge Substation (132 kV), about 3.7 km away.
How clean is the power for 醫院管理局支援服務中心 Hospital Authority Supporting Services Centre?
The grid in Hong Kong SAR China emits about 673 g CO₂ per kWh (2024). Largest sources: gas 63.8%, coal 33.5%, oil and other fossil 1.2%.
Data centers near Tung Chung
- 南大嶼山海底電纜站 South Lantau Submarine Cable Station 6.6 km · 1.2 MW
- EdgeX by HGC 18.9 km
- AirTrunk HKG1 18.9 km
- HKBN Cable TV Tower Data Centre 19.8 km
- Equinix HK6 - Hong Kong 19.9 km
- iTech Towers 1 20.1 km
- MCX10 20.3 km
- Equinix HK2 - Hong Kong 20.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.