IBM data center / Centro Tecnológico San Bernardo
IBM data center / Centro Tecnológico San Bernardo is an operational data center in San Bernardo, Chile. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.6 MW (range 0.6 MW to 4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,409 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenida Puerta Sur 03320 |
| Coordinates | -33.55349, -70.71174 |
Power and grid
| Nearest high-voltage substation | Subestación Las Acacias, 110 kV, 1.5 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Chena, 220 kV, 3.3 km away |
| HV substations within 10 km | 14 |
| Power plants within 50 km | 896 MW in 86 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IBM data center / Centro Tecnológico San Bernardo use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
How close is IBM data center / Centro Tecnológico San Bernardo to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Las Acacias (110 kV), about 1.5 km away.
How clean is the power for IBM data center / Centro Tecnológico San Bernardo?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Data centers near San Bernardo
- Odata Data Center 2.5 km · 14 MW
- Amazon Web Services 9.4 km · 4.8 MW
- CMET 12.0 km
- Mediaflog 12.7 km
- Grupo ZGH - La Florida 12.7 km
- DC Porvenir 13.2 km
- Nextstream Data Center 13.2 km
- entel - CNT (torre entel) 13.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.