IDC Infortel
IDC Infortel is an operational data center operated by Infortel Comunicacoes LTDA in Eunapolis, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Infortel Comunicacoes LTDA |
| Networks | 3 networks PeeringDB. |
| Address | Rua Paulino Mendes Lima,350 |
| Coordinates | -16.37856, -39.58866 |
| Website | infortel.net.br |
Power and grid
| Nearest high-voltage substation | Subestação Eunápolis, 138 kV, 2.6 km away (Coelba) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Veracel, 230 kV, 37.8 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 462 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 24.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41 °C (2001 to 2025) |
| Cooling degree days | 2,528 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.19 kWh per m² per day |
| Wind at 50 m | 3.8 m/s average |
| Water stress today | Low (<10%) (Bahia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is IDC Infortel to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Eunápolis (138 kV), about 2.6 km away.
How clean is the power for IDC Infortel?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates IDC Infortel?
Infortel Comunicacoes LTDA.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.