Data Center Directory

深圳联通 同乐IDC

深圳联通 同乐IDC is an operational data center operated by 中国联通 in Longgang, China. Our footprint estimate of its power is about 7.4 MW.

Key facts

StatusOperational
Operator中国联通
Facility power7.4 MW (range 3.7 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,198 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates22.72232, 114.31666

Power and grid

Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Average temperature23.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.6 °C (2001 to 2025)
Cooling degree days2,112 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.14 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayLow - Medium (10-20%) (Guangdong)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does 深圳联通 同乐IDC use?

We estimate the facility power at about 7.4 MW. Estimate from building footprint, low confidence.

How clean is the power for 深圳联通 同乐IDC?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.

Who operates 深圳联通 同乐IDC?

中国联通.

Data centers near Longgang

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.