Data Center Directory

Information Systems Facility

Information Systems Facility is an operational data center operated by WSMR in White Sands, United States. Our footprint estimate of its power is about 3.1 MW.

Key facts

StatusOperational
OperatorWSMR
Facility power3.1 MW (range 1.5 MW to 4.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,548 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAberdeen Avenue 120, 88002, White Sands
Coordinates32.38051, -106.48107

Power and grid

UtilityEl Paso Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityEPE
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 1.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Information Systems Facility use?

We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Information Systems Facility?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Information Systems Facility?

WSMR.

Data centers near White Sands

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.