ISSDC
ISSDC is an operational data center in Kumbalgod, India. Our footprint estimate of its power is about 5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5 MW (range 2.5 MW to 7.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,134 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 12.90169, 77.36988 |
| Website | issdc.gov.in |
Power and grid
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 23.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.4 °C (2001 to 2025) |
| Cooling degree days | 2,222 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.61 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | High (40-80%) (Karnataka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ISSDC use?
We estimate the facility power at about 5 MW. Estimate from building footprint, low confidence.
How clean is the power for ISSDC?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Data centers near Kumbalgod
- Reliance Communications Internet Data Center 23.5 km · 2 MW
- DV-IDC-BAN01 24.0 km
- City Online Services Ltd , Bengaluru 25.4 km
- CtrlS Bangalore DC1 26.0 km
- Ishan Technologies Bengaluru 26.6 km
- Bell Teleservices India Pvt Ltd 27.2 km
- Infynix Bengaluru 27.6 km
- Netmagic Bangalore DC02 32.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.