IT- und Data Center Urfahr
IT- und Data Center Urfahr is an operational data center operated by LINZ STROM GAS WÄRME in Linz, Austria. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | LINZ STROM GAS WÄRME |
| Facility power | 0.7 MW (range 0.4 MW to 1.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 602 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | IT- und Data Center Linz |
| Address | Freistädter Straße 204, 4040, Linz |
| Coordinates | 48.32421, 14.30001 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Linz-Nord, 110 kV, 100 m away (Linz Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Aschach, 220 kV, 21.8 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 2.3 GW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 7.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 89 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.21 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IT- und Data Center Urfahr use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
How close is IT- und Data Center Urfahr to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Linz-Nord (110 kV), about 100 m away.
How clean is the power for IT- und Data Center Urfahr?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates IT- und Data Center Urfahr?
LINZ STROM GAS WÄRME.
Data centers near Linz
- ITandTEL TechCenter Linz 785 m
- Energie AG Data PowerTower Provider Room 3.5 km
- IT- und Data Center Linz 4.7 km
- Energie AG Data PowerCube 8.8 km
- ITandTEL Perg 25.2 km
- ITandTEL Wels 26.4 km
- TTI Repeaterstation Sattledt 32.9 km
- forpsi DC CZ1 67.0 km