JasTel Data Center (Thailand)
JasTel Data Center (Thailand) is an operational data center operated by Jastel Network (Thailand) in Nonthaburi, Thailand. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Jastel Network (Thailand) |
| Networks | 24 networks, 1 internet exchanges PeeringDB. |
| Address | 200 Moo 4 7th fl. Jasmine International Tower Chaengwattana road Pakkret, JasTel Data Center 200 หมู่ 4 7th fl. อาคารจัสมินอินเตอร์เนชั่นแนล ตำบล ปากเกร็ด อำเภอ ปากเกร็ด นนทบุรี 11120 |
| Coordinates | 13.90515, 100.52161 |
| Website | jastel.co.th |
Power and grid
| Nearest high-voltage substation | สถานีไฟฟ้าแรงสูงแจ้งวัฒนะ, 500 kV, 3.7 km away (EGAT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 6.5 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 526 g CO₂ per kWh (Thailand, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 61.5%, coal 16.7%, bioenergy 11%, solar 5%, hydro 3.9%. Clean power: 21.7% |
Climate and water
| Average temperature | 27.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 3,650 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Extremely High (>80%) (Nonthaburi) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is JasTel Data Center (Thailand) to the power grid?
The nearest high-voltage substation in OpenStreetMap is สถานีไฟฟ้าแรงสูงแจ้งวัฒนะ (500 kV), about 3.7 km away.
How clean is the power for JasTel Data Center (Thailand)?
The grid in Thailand emits about 526 g CO₂ per kWh (2025). Largest sources: gas 61.5%, coal 16.7%, bioenergy 11%.
Who operates JasTel Data Center (Thailand)?
Jastel Network (Thailand).
Data centers near Nonthaburi
- SCB Chaengwattana Building 1.2 km · 8.6 MW
- ReadyIDC DC1 2.6 km
- Arise IDC - Bangkok North 1, Thailand 3.1 km
- NT Nonthaburi Telecommunication Center 4.3 km
- ReadyIDC Edge DC2 - Srisaman 4.4 km
- KSC-BKK 6.0 km
- UIH BCH4 IDC - Bangkok, Thailand 7.5 km
- SYMPHONY THAI - IDC BANGKOK 9.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.