KACST Building 44
KACST Building 44 is an operational data center operated by King Abdul Aziz City for Science and Technology in Riyadh, Saudi Arabia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | King Abdul Aziz City for Science and Technology |
| Networks | 8 networks, 1 internet exchanges PeeringDB. |
| Address | King Abdullah Branch Rd, Al Raed |
| Coordinates | 24.71805, 46.64639 |
| Website | kacst.edu.sa |
Power and grid
| Nearest high-voltage substation | Ngrid 9020, 380 kV, 6.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 13 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 676 g CO₂ per kWh (Saudi Arabia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 63.3%, oil and other fossil 31.9%, solar 4.5%. Clean power: 4.8% |
Climate and water
| Average temperature | 25.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 46.4 °C (2001 to 2025) |
| Cooling degree days | 3,024 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 6.21 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Extremely High (>80%) (Saudi Arabia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is KACST Building 44 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Ngrid 9020 (380 kV), about 6.4 km away.
How clean is the power for KACST Building 44?
The grid in Saudi Arabia emits about 676 g CO₂ per kWh (2025). Largest sources: gas 63.3%, oil and other fossil 31.9%, solar 4.5%.
Who operates KACST Building 44?
King Abdul Aziz City for Science and Technology.
Data centers near Riyadh
- Saudi Aramco Dammam-7 6.4 km · 5.1 MW
- Ezditek data center in Riyadh 17.9 km · 5.3 MW
- Nournet Nahdah Data Centre 19.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.