KDDI千倉海底線中継所
KDDI千倉海底線中継所 is an operational data center operated by KDDI in Minamibōsō, Japan. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | KDDI |
| Facility power | 11 MW (range 5.7 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,730 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.97059, 139.96028 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Medium - High (20-40%) (Chiba) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does KDDI千倉海底線中継所 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for KDDI千倉海底線中継所?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates KDDI千倉海底線中継所?
KDDI.
Data centers near Minamibōsō
- NTT 68.0 km · 1.3 MW
- Americable Datacenter 72.2 km
More KDDI data centers
- KDDI Japan
- KDDI Japan
- KDDI data center in Chiyoda Japan
- KDDI data center in Osaka Japan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.