Keel Infrastructure
Keel Infrastructure is an operational data center in Sherbrooke, Canada. Our footprint estimate of its power is about 8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8 MW (range 4 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,658 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue de la Pointe 2320 |
| Coordinates | 45.39264, -71.93089 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 120 kV, 2.7 km away (Hydro-Sherbrooke) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 6 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 5.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 120 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.43 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Keel Infrastructure use?
We estimate the facility power at about 8 MW. Estimate from building footprint, low confidence.
How close is Keel Infrastructure to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (120 kV), about 2.7 km away.
How clean is the power for Keel Infrastructure?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near Sherbrooke
- ZT-DC-01 6.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.