KevlinX Brussels

KevlinX Brussels is an operational data center operated by KevlinX in Brussels, Belgium. Our footprint estimate of its power is about 8.8 MW.

Key facts

StatusOperational
OperatorKevlinX
Facility power8.8 MW (range 4.4 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,340 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asBRU01
AddressAntoon Van Osslaan 1/B 27 & 29
Opened2026
Coordinates50.90594, 4.40294
Websitekevlinx.com

Power and grid

Grid carbon intensity151 g CO₂ per kWh (Belgium, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1%
Industrial power priceEUR 0.133 per kWh (Belgium, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.6 °C (2001 to 2025)
Cooling degree days87 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.03 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayExtremely High (>80%) (Belgium)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does KevlinX Brussels use?

We estimate the facility power at about 8.8 MW. Estimate from building footprint, low confidence.

How clean is the power for KevlinX Brussels?

The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.

Who operates KevlinX Brussels?

KevlinX.