Data Center Directory

KR1 강남데이터센터

KR1 강남데이터센터 is an operational data center operated by 엠피리온 디지털 in Seongnam-si, South Korea. Our footprint estimate of its power is about 20 MW.

Key facts

StatusOperational
Operator엠피리온 디지털
Facility power20 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,821 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates37.45811, 127.03783

Power and grid

Nearest high-voltage substationUnnamed substation, 154 kV, 1.1 km away (한국전력공사)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 3.1 km away
HV substations within 10 km37
Power plants within 50 km21 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity418 g CO₂ per kWh (South Korea, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 31.1%, nuclear 29.4%, gas 28%, solar 6%, bioenergy 3.2%. Clean power: 39.9%

Climate and water

Average temperature11.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.4 °C (2001 to 2025)
Cooling degree days551 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.81 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Gyeonggi-do)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does KR1 강남데이터센터 use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

How close is KR1 강남데이터센터 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (154 kV), about 1.1 km away.

How clean is the power for KR1 강남데이터센터?

The grid in South Korea emits about 418 g CO₂ per kWh (2025). Largest sources: coal 31.1%, nuclear 29.4%, gas 28%.

Who operates KR1 강남데이터센터?

엠피리온 디지털.