Data Center Directory

LEDC - TMW1 - Tamworth

LEDC - TMW1 - Tamworth is an operational data center operated by Leading Edge Data Centre in North Tamworth, Australia. Our footprint estimate of its power is about 0.6 MW.

Key facts

StatusOperational
OperatorLeading Edge Data Centre
Facility power0.6 MW (range 0.3 MW to 0.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 471 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressJohnston Street 140-148, 2340
Coordinates-31.07421, 150.92160

Power and grid

Nearest high-voltage substationTamworth 132/66 subtransmission substation, 132 kV, 6.3 km away (TransGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationTamworth 330/132 subtransmission substation, 330 kV, 8.6 km away
HV substations within 10 km3
Power plants within 50 km7 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days399 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.2 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does LEDC - TMW1 - Tamworth use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.

How close is LEDC - TMW1 - Tamworth to the power grid?

The nearest high-voltage substation in OpenStreetMap is Tamworth 132/66 subtransmission substation (132 kV), about 6.3 km away.

How clean is the power for LEDC - TMW1 - Tamworth?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates LEDC - TMW1 - Tamworth?

Leading Edge Data Centre.

Data centers near North Tamworth

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.