Leonardo SpA davinci-1
Leonardo SpA davinci-1 is an operational AI data center operated by Leonardo in Genoa, Italy. Its power is about 0.3 MW. Epoch AI estimates about 101 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Leonardo |
| Facility power | 0.3 MW Reported (Epoch AI or owner data) |
| AI compute | 101 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 320 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 120 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Genoa, Italy |
| Coordinates | 44.40812, 8.93118 |
Power and grid
| Nearest high-voltage substation | Genova Grazie, 132 kV, 500 m away (Enel Distribuzione) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Ital Cornigliano Genova, 220 kV, 5.4 km away |
| HV substations within 10 km | 22 |
| Power plants within 50 km | 778 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.8 °C (2001 to 2025) |
| Cooling degree days | 457 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.93 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Liguria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Leonardo SpA davinci-1 | NVIDIA A100 | 320 | 0.3 MW | 2020-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Leonardo SpA davinci-1 use?
Public data puts the facility power at about 0.3 MW. Reported (Epoch AI or owner data).
What chips does Leonardo SpA davinci-1 use?
Reported chips: NVIDIA A100.
How close is Leonardo SpA davinci-1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Genova Grazie (132 kV), about 500 m away.
How clean is the power for Leonardo SpA davinci-1?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Leonardo SpA davinci-1?
Leonardo.
Data centers near Genoa
- Genova Digital Hub 2.2 km
- Liguria Digitale Data Center - WTC 2.4 km
- Equinix GN1 - Genoa 2.6 km
- Quadrivium Digital (QGEN01) 4.2 km · 11 MW
- Liguria Digitale Data Center - Erzelli 5.7 km
- NetPro IT & HatHost DC1 24.5 km
- Rocket Way DC Boissano 64.4 km
- TIM data center in Voghera 65.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.