LexisNexus Springfield is an operational data center in Springfield, United States. Our footprint estimate of its power is about 9.9 MW.

Key facts

StatusOperational
Facility power9.9 MW (range 4.9 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,212 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBenjamin Drive 601, 45502, Springfield
Coordinates39.91280, -83.72366
Websitelexisnexis.com/pdf/Litigation/MTS_Springfield_Data_Center.pdf

Power and grid

UtilityOhio Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 10.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does LexisNexus Springfield use?

We estimate the facility power at about 9.9 MW. Estimate from building footprint, low confidence.

How clean is the power for LexisNexus Springfield?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Data centers near Springfield

Sources

Correct this page or get the data