Logon Broadband Karachi
Logon Broadband Karachi is an operational data center operated by Logon Broadband Pvt in Karachi, Pakistan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Logon Broadband Pvt |
| Address | Office No. E-1 executive Floor Glass Tower Near Teen Talwar Clifton Karachi |
| Coordinates | 24.83612, 67.03393 |
| Website | logon.com.pk |
Power and grid
| Grid carbon intensity | 309 g CO₂ per kWh (Pakistan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 23.1%, gas 23%, solar 21.2%, coal 14.5%, nuclear 14.1%. Clean power: 60.9% |
Climate and water
| Average temperature | 26.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 3,084 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.66 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Pakistan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Logon Broadband Karachi?
The grid in Pakistan emits about 309 g CO₂ per kWh (2025). Largest sources: hydro 23.1%, gas 23%, solar 21.2%.
Who operates Logon Broadband Karachi?
Logon Broadband Pvt.
Data centers near Karachi
- CubeXS Weatherly 2.5 km
- Al-Ayesha Chambers 2.6 km
- Disk Masters pakistan Karachi 2.9 km
- karachi massage center & Spa 3.9 km
- M.A.F Co. 4.2 km
- SSS & Company 4.3 km
- PTCL Pak Capital 4.4 km
- PTCL Misri Shah DC 5.0 km