Long Mao Network

Long Mao Network is an operational data center operated by Long Mao Network in Tachileik, Myanmar (Burma). No power figure is public for this site yet.

Key facts

StatusOperational
OperatorLong Mao Network
Networks2 networks, 1 internet exchanges
PeeringDB.
AddressNO.PALA-1/696,BOGYOKE STREET YAN AUNG MYAY WARD,, TACHILEIK TOWNSHIP, FW65+7R Tachileik
Coordinates20.46072, 99.90955
Websitelongmaonetwork.com

Power and grid

Nearest high-voltage substationสถานีไฟฟ้าแม่สาย, 115 kV, 4.6 km away (PEA)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km3 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity480 g CO₂ per kWh (Myanmar (Burma), 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 43.8%, gas 43.8%, solar 5.5%, coal 5.3%, bioenergy 1.2%. Clean power: 50.4%

Climate and water

Average temperature23.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days2,090 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.75 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayMedium - High (20-40%) (Myanmar (Burma))
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Long Mao Network to the power grid?

The nearest high-voltage substation in OpenStreetMap is สถานีไฟฟ้าแม่สาย (115 kV), about 4.6 km away.

How clean is the power for Long Mao Network?

The grid in Myanmar (Burma) emits about 480 g CO₂ per kWh (2024). Largest sources: hydro 43.8%, gas 43.8%, solar 5.5%.

Who operates Long Mao Network?

Long Mao Network.