Malmö Västergatan 4 / Stortorget
Malmö Västergatan 4 / Stortorget is an operational data center operated by Stena Fastigheter in Malmö, Sweden. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Stena Fastigheter |
| Networks | 28 networks, 5 internet exchanges PeeringDB. |
| Address | Västergatan 4 |
| Coordinates | 55.60682, 12.99845 |
Power and grid
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.9 °C (2001 to 2025) |
| Cooling degree days | 45 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 7.7 m/s average |
| Water stress today | Low (<10%) (Sweden) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Malmö Västergatan 4 / Stortorget?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.
Who operates Malmö Västergatan 4 / Stortorget?
Stena Fastigheter.
Data centers near Malmö
- Bahnhof Sparven 802 m
- Global Crossing Malmo 1.1 km
- 31173 DC Malmö Scheelegatan 2.6 km
- Malmö/B 5.6 km
- GlobalConnect Malmö 5.7 km
- Datacenter Lund, Alfa Laval 16.3 km
- 31173 DC Lund Mobilvägen 18.8 km
- Vaultica Data Centers | COP01 24.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.