Marysville Place is an operational data center in Fredericton Northside, Canada. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
Facility power16 MW (range 7.9 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,290 m² building outline x 2.5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMcGloin Street 20
Coordinates45.97824, -66.58879

Power and grid

Nearest high-voltage substationMarysville Substation, 138 kV, 1.4 km away (NB Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationKeswick 230kV Substation, 345 kV, 21.8 km away
HV substations within 10 km1
Power plants within 50 km662 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature5.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32 °C (2001 to 2025)
Cooling degree days111 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.47 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow (<10%) (New Brunswick)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Marysville Place use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

How close is Marysville Place to the power grid?

The nearest high-voltage substation in OpenStreetMap is Marysville Substation (138 kV), about 1.4 km away.

How clean is the power for Marysville Place?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.