Marysville Place
Marysville Place is an operational data center in Fredericton Northside, Canada. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,290 m² building outline x 2.5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | McGloin Street 20 |
| Coordinates | 45.97824, -66.58879 |
Power and grid
| Nearest high-voltage substation | Marysville Substation, 138 kV, 1.4 km away (NB Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Keswick 230kV Substation, 345 kV, 21.8 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 662 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 5.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32 °C (2001 to 2025) |
| Cooling degree days | 111 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low (<10%) (New Brunswick) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Marysville Place use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is Marysville Place to the power grid?
The nearest high-voltage substation in OpenStreetMap is Marysville Substation (138 kV), about 1.4 km away.
How clean is the power for Marysville Place?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near Fredericton Northside
- Equinix SJ1 - Saint John 85.2 km
- PureColo STJ01 (Saint John) 88.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.